Projects and Case Studies

Real deployments, real results

200+ live sites across Egypt and the region. Each one designed, built and operated by the same EV Flash team. Browse a few of our most ambitious projects below.

500+Chargers Deployed
150+Active Stations
28 MWInstalled Capacity
99.9%Network Uptime
City Mall
Commercial Retail

City Mall, DC Fast Charging Hub

8-bay DC fast charging hub at flagship mall, integrated with mall loyalty program.

8Chargers
960 kWCapacity
99.8%Uptime
Coastal Resort
Hospitality

Coastal Resort, Premium Wallboxes

20 dual-port AC chargers across resort parking with guest app integration.

20Chargers
440 kWCapacity
99.7%Uptime
Delivery Fleet Depot
Fleet

Delivery Fleet Depot, 60-Vehicle Hub

Mixed AC/DC depot for 60 electric delivery vehicles with smart scheduling.

60Chargers
2.4 MWCapacity
99.9%Uptime
Regional Hospital
Healthcare

Regional Hospital, Visitor Charging

12-charger network serving staff, ambulances and patient visitor parking.

12Chargers
264 kWCapacity
99.8%Uptime
Tech Campus
Corporate

Tech Campus, Employee Charging

30 AC + 4 DC chargers across a multi-building corporate campus.

34Chargers
900 kWCapacity
99.9%Uptime
Sheikh Zayed Compound
Residential Compound

Sheikh Zayed Garden Compound

Dual-outlet AC chargers across 200 residential units with shared billing.

50Chargers
1.1 MWCapacity
99.9%Uptime
Highway Mega Station
Highway Station

Cairo Alexandria Highway Hub

14-bay highway mega station with DC ultra, canopy and on-site retail.

14Chargers
2.5 MWCapacity
99.7%Uptime
Luxury Hotel
Hospitality

Downtown Luxury Hotel

16 dedicated guest chargers in valet parking with seamless room billing.

16Chargers
352 kWCapacity
99.9%Uptime
Taxi Depot
Fleet, Ride-hail

City Taxi Hub, 80-Vehicle Network

Mixed AC and DC fast charging for an electric taxi fleet across 3 depots.

80Chargers
3.2 MWCapacity
99.8%Uptime

Your project could be next

Tell us about your site. We will scope it, model the economics and reply within 24 hours.